1) Installation and disassembly: Prepare a special installation plan in advance, report it to the competent department of the unit, supervision and other relevant departments for approval, and then implement it by a professional team with corresponding qualifications.


2) The elevator driver is certified to work. Before each shift, check the electrical devices of the brakes, limit devices, ladder doors, protective doors, etc., and confirm that they are sensitive and reliable before they can be used at startup. When you transfer the shift, make a record of the shift.


3) The entrance and exit of the cage shall be set up with a protective shed, which is covered with double-layered scaffolding boards, and the floor unloading ports are equipped with protective safety doors.